Hot Weather Concreting Guidelines

During hot summer months all projects benefit by implementing hot weather concrete practices. Appropriate hot weather concreting practices are described in ACI 305R. Most project specifications that address hot weather concreting practices only mention that concrete should be placed in accordance with ACI 305, or mention a maximum concrete placement temperature of 90 degrees Fahrenheit. The reality is that most architects, engineers, and contractors aren't familiar with ACI 305R, and only specifying a maximum concrete temperature may not be enough to avoid concrete problems.

Hot weather is defined by ACI 305R as any combination of the following conditions that tends to impair the quality of freshly mixed or hardened concrete by accelerating the rate of moisture loss and rate of cement hydration:

  • High ambient temperature
  • High concrete temperature
  • Low relative humidity
  • Wind speed
  • Solar radiation

Concrete problems in hot weather include increased water demand, increased rate of setting, increased tendency for drying shrinkage, decreased durability, and greater variability of surface appearance. Any damage to concrete caused by hot weather cannot be fully corrected. During the warm summer months it is important to take preemptive measures so that concrete performs properly.

The following measures will reduce or avoid potential problems of hot weather concreting:

  • Address hot weather concreting within the project specifications
  • Discuss hot weather concreting requirements during preconstruction meetings
  • Select a contractor that has experience with hot weather concreting
  • Discuss hot weather concreting requirements during preplacement meetings
  • Proportion mixes for hot weather concreting
  • Utilize chemical admixtures, particularly high-range water reducing admixtures, to maintain workability
  • Use cool water or ice during concrete batching
  • Store aggregate sources in the shade
  • Sprinkle and fog spray coarse aggregates
  • Use transport mixers that are free of buildup of hardened concrete and excessive wear of mixer blades
  • Minimize time to transport, place, consolidate, and finish concrete
  • Minimize the amount of concrete mixing
  • Do not add water in excess of the proportioned maximum water-cementations materials ratio (w/cm)
  • Place concrete during times of the day or night when weather conditions are favorable
  • Place concrete on a moist subgrade
  • Protect the concrete from moisture loss during placement and curing
  • Perform field testing of concrete to determine that the concrete is within design parameters for temperature, slump, and air content

Basically, concrete can be placed with favorable results during hot weather periods as long as all members of the construction team understand what is involved with hot weather concreting and all members of the construction team know what their role is to produce, place, test, and cure concrete appropriately.

Philip R. Barber, P.E.
Director of CMT

 

Relevant at Geo-Hydro Post

9.1.11 Geo-Hydro will be working with CAPE on the repair of potable water distribution at Dobbins Air Reserve Base. We will be providing construction inspection and quality control testing.

8.15.11 Geo-Hydro is pleased to have been selected by Forsyth Technical Community College to provide Special Inspections and Testing for the Phase I additions to the FTCC Career/Administration Facility.

8.4.11 Geo-Hydro is pleased to help the City of Dunwoody with their 2011 road resurfacing project. We are providing construction inspections and testing of the new road surfaces.

7.22.11 Aspen Heights is creating unique student housing neighborhoods near college campuses throughout the southeast. Geo-Hydro is excited to be providing geotechnical engineering and Special Inspections and testing for their newest project in Athens, Georgia.

6.23.11 Geo-Hydro is proud to have been selected to work with Perkins+Will on the new Veterinary Medicine Learning Center at the University of Georgia.

4.15.11 Luis Babler and Milt Schreiber presented "MSE Retaining Walls, The Good, The Bad, and the Ugly" to the Northeast Georgia Branch of ASCE.

3.11.11 Geo-Hydro has been pleased to have been selected to perform Special Inspections and testing for the $25 million reconstruction of Eastbrook Middle School in Whitfield County, Georgia.

2.25.11 Construction is beginning on the extensive renovation of the historic Hoyt Coe Building at North Georgia Technical College. Geo-Hydro is providing Special Inspections and testing for the project.

1.4.11 Geo-Hydro is continuing our long history of helping Six Flags Over Georgia build roller coasters with the Dare Devil Dive.

12.7.10 Geo-Hydro is proud to have been selected to provide special inspections and testing for the historic renovations of Ohio Hall and Miller Hall at Fort Valley State University.

11.12.10 Geo-Hydro has been selected to provide special inspections and testing for the re-construction of the Cave Spring Rehabilitation Center (DOL-20).

11.8.10 Geo-Hydro has been chosen to provide geotechnical engineering for the new Rose Bowl Field indoor football practice facility at Georgia Tech.

11.5.10 Congratulations to White Provision, which was given the 2010 Development of Excellence Award by the Atlanta Regional Commission.

10.14.10 We are pleased to announce that Geo-Hydro has been selected to perform special inspections and testing for the $80 million improvement project to the Hugh A. Wyckoff Water Treatment Plant in Cobb County, Georgia.